| COSFP |
RP |
2001 |
Fire Protection in Refineries |
10 |
|
x |
|
| COSFP |
RP |
2009 |
Safe Welding, Cutting and Hot Work Practices in the Petroleum and Petrochemical Industries |
8 |
|
x |
|
| COSFP
|
RP
|
2201
|
Safe Hot Tapping Practices in the Petroleum and Petrochemical Industries
|
6
|
|
x
|
|
| CRE
|
RP
|
581-A1 |
Risk-Based Inspection Methodology
|
3 |
|
|
x
|
| CRE
|
Std
|
672
|
Packaged, Integrally Geared Centrifugal Air Compressors for Petroleum, Chemical, and Gas Industry Services
|
5
|
|
x
|
|
| CRE
|
TR
|
684
|
Tutorial on the API Standard Paragraphs Covering Rotor Dynamics and Balance
|
3
|
|
|
x
|
| CRE
|
RP
|
751
|
Safe Operation of Hydrofluoric Acid Alkylation Units
|
5
|
x
|
|
|
| CRE
|
RP
|
12R1
|
Recommended Practice for Setting, Maintenance, Inspection, Operation, and Repair of Tanks in Production Service
|
6
|
|
x |
|
| .CRE |
Std |
620-A3 |
Design and Construction of Large, Welded, Low-Pressure Storage Tanks |
12 |
|
x |
|
| CRE
|
Std
|
625 |
Tank Systems for Refrigerated Liquefied Gas Storage
|
3 |
|
x
|
|
| CRE |
Std |
625 |
Addendum 3 to Tank Systems for Refrigerated Liquefied Gas Storage |
2 |
x |
|
|
| CRE |
Std |
650 |
Welded Tanks for Oil Storage |
13 |
x |
|
|
| CRE |
Std |
653-A2 |
Addendum 2 to Tank Inspection, Repair, Alteration and Reconstruction |
5 |
x |
|
|
| CRE
|
Std
|
685-A1
|
Sealless Centrifugal Pumps for Petroleum, Petrochemical, and Gas Industry Services
|
2
|
|
|
x
|
| CRE
|
RP
|
500
|
Recommended Practice for Classification of Locations for Electrical Installations at Petroleum Facilities Classified as Class I, Division 1 and Division 2 (includes Errata dated January 2014)
|
4
|
x
|
|
|
| CRE |
Std |
510 |
Pressure Vessel Inspection Code |
10 |
x |
|
|
| CRE
|
Std
|
521
|
Guide for Pressure-relieving and Depressuring Systems
|
7
|
|
x
|
|
| CRE
|
Std
|
527
|
Seat Tightness of Pressure Relief Valves
|
5
|
|
x
|
|
| CRE
|
Std
|
530
|
Calculation of Heater-tube Thickness in Petroleum Refineries
|
8
|
x
|
|
|
| CRE
|
Std
|
534
|
Heat Recovery Steam Generators
|
3
|
x
|
|
|
| CRE
|
Std
|
535
|
Burners for Fired Heaters in General Refinery Services
|
4
|
x
|
|
|
| CRE |
Std |
537-A1 |
Addendum 1 to Flare Details for Petroleum, Petrochemical and Natural Gas Industries |
3 |
x |
|
|
| CRE
|
Std
|
538
|
Industrial Fired Boilers for General Refinery Service
|
2
|
x
|
|
|
| CRE
|
RP
|
540
|
Electrical Installations in Petroleum Processing Plants
|
5
|
x
|
|
|
| CRE
|
Std
|
546
|
Brushless Synchronous Machines 500 kVA and Larger
|
4
|
|
x
|
|
| CRE
|
RP
|
552
|
Transmission Systems
|
2
|
x
|
|
|
| CRE
|
RP
|
553
|
Refinery Valves and Accessories for Control and Safety Instrumented Systems
|
3
|
x
|
|
|
| CRE
|
RP
|
554 Part 1
|
Process Control Systems, Part 1: Process Control Systems Functions and Funtional Specification Development
|
3
|
|
x
|
|
| CRE
|
RP
|
554 Part 2
|
Process Control Systems, Part 2: Process Control, System Design
|
2
|
|
x
|
|
| CRE
|
RP
|
554 Part 3
|
Process Control Systems, Part 3: Project Execution and Process Control System Ownership
|
2
|
|
x
|
|
| CRE
|
API
|
555
|
Process Analyzers
|
4
|
x
|
|
|
| CRE
|
RP
|
556
|
Instrumentation, Control, and Protective Systems for Gas Fired Heaters
|
3
|
x
|
|
|
| CRE
|
Std
|
561
|
Reforming Furnaces for Hydrogen and Syngas Production
|
1
|
x
|
|
|
| CRE
|
Std
|
565
|
Thermal Reactors in Sulfur Recovery Units for General Refinery Service
|
1
|
x
|
|
|
| CRE
|
RP
|
571
|
Damage Mechanisms Affecting Fixed Equipment in the Refining Industry
|
3
|
|
|
x
|
| CRE
|
RP
|
572
|
Inspection Practices for Pressure Vessels
|
5
|
|
x
|
|
| CRE
|
RP
|
573
|
Inspection of Fired Boilers and Heaters
|
4
|
|
x
|
|
| CRE
|
RP
|
575
|
Inspection of Atmospheric & Low Pressure Storage Tanks
|
4
|
x
|
|
|
| CRE
|
RP
|
577
|
Welding Processes, Inspection, and Metallurgy
|
3
|
x
|
|
|
| CRE |
RP |
578 |
Material Verification Program for New and Existing Alloy Piping Systems |
4 |
x |
|
|
| CRE
|
RP
|
582
|
Welding Guidelines for the Chemical, Oil, and Gas Industries
|
4
|
x
|
|
|
| CRE
|
RP
|
583
|
Corrosion Under Insulation and Fireproofing
|
2
|
x
|
|
|
| CRE
|
RP
|
584
|
Integrity Operating Windows
|
2
|
x
|
|
|
| CRE |
RP |
585 |
Pressure Equipment Integrity Incident Investigation |
2 |
x |
|
|
| CRE
|
RP
|
591
|
Process Valve Qualification Procedure
|
6
|
|
x
|
|
| CRE
|
RP
|
599
|
Metal Plug Valves - Flanged and Butt-welding Ends, Bolted Bonnets
|
8
|
|
x
|
|
| CRE
|
Std
|
600
|
Steel Gate Valves - Flanged and Butt-welding Ends, Bolted Bonnets
|
14
|
x
|
|
|
| CRE
|
Std
|
602
|
Gate, Globe, and Check Valves for Sizes DN 100 (NPS 4) and Smaller for the Petroleum and Natural Gas Industries
|
11
|
x
|
|
|
| CRE
|
Std
|
608
|
Metal Ball Valves--Flanged, Threaded and Butt-Welding Ends
|
6
|
|
x
|
|
| CRE
|
Std
|
610
|
Centrifugal Pumps for Petroleum, Petrochemical and Natural Gas Industries
|
12
|
|
x
|
|
| CRE
|
Std
|
611
|
General Purpose Steam Turbines for Petroleum, Chemical, and Gas Industry Services
|
6
|
x
|
|
|
| CRE
|
Std
|
612
|
Petroleum, petrochemical and natural gas industries—Steam turbines—Special-purpose applications
|
8
|
|
x
|
|
| CRE
|
Std
|
613
|
Special Purpose Gear Units for Petroleum, Chemical and Gas Industry Services
|
6
|
|
x
|
|
| CRE
|
Std
|
614
|
Lubrication, Shaft-Sealing, and Control-Oil Systems and Auxiliaries for Petroleum, Chemical and Gas Industry Services
|
6
|
x
|
|
|
| CRE
|
RP
|
615
|
Valve Selection Guide
|
3
|
x
|
|
|
| CRE
|
Std
|
616
|
Gas Turbines for the Petroleum, Chemical and Gas Industry Services
|
6
|
|
x
|
|
| CRE
|
Std
|
617
|
Axial and Centrifugal Compressors and Expander-compressors for Petroleum, Chemical and Gas Industry Services
|
9
|
x
|
|
|
| CRE
|
Std
|
618
|
Reciprocating Compressors for Petroleum, Chemical and Gas Industry Services
|
6
|
|
x
|
|
| CRE
|
Std
|
623
|
Steel Globe Valves—Flanged and Butt-welding Ends, Bolted Bonnets
|
2
|
x
|
|
|
| CRE
|
Std
|
624
|
Type Testing of Rising Stem Valves Equipped with Flexible Graphite Packing for Fugitive Emissions
|
2
|
x
|
|
|
| CRE
|
RP
|
651
|
Cathodic Protection of Aboveground Storage Tanks
|
5
|
x
|
|
|
| CRE
|
RP
|
652
|
Linings of Aboveground Petroleum Storage Tank Bottoms
|
5
|
x
|
|
|
| CRE |
TR |
654 |
Caulking or Sealing the Bottom Edge Projection to the Foundation |
1 |
x |
|
|
| CRE
|
Std
|
660
|
Shell-and-Tube Heat Exchangers
|
10
|
x
|
|
|
| CRE
|
Std
|
661
|
Petroleum, Petrochemical, and Natural Gas Industries—Air-Cooled Heat Exchangers for General Refinery Service
|
8
|
x
|
|
|
| CRE |
Std |
663 |
Hairpin-Type Heat Exchangers |
2 |
x |
|
|
| CRE
|
Std
|
664
|
Spiral Plate Heat Exchangers
|
2
|
x
|
|
|
| CRE
|
Std
|
667
|
Plate and Frame Heat Exchangers for General Refinery Services (Formerly Std. 662, Part 1)
|
1
|
x
|
|
|
| CRE
|
Std
|
669
|
Heat Recovery Systems
|
1
|
x
|
|
|
| CRE
|
Std
|
671
|
Special Purpose Couplings for Petroleum, Chemical and Gas Industry Services
|
5
|
|
x
|
|
| CRE
|
Std
|
673
|
Centrifugal Fans for Petroleum, Chemical and Gas Industry Services
|
4
|
x
|
|
|
| CRE
|
Std
|
676
|
Positive Displacement Pumps - Rotary
|
4
|
x
|
|
|
| CRE
|
Std
|
677
|
General Purpose Gears, Slow Speed (Extruder) gears, and Epicyclic gear units for Petroleum, Chemical, and Gas Industry Services
|
4
|
|
x
|
|
| CRE
|
Std
|
681
|
Liquid Ring Vacuum Pumps and Compressors
|
2
|
|
x
|
|
| CRE
|
Std
|
682
|
Pumps—Shaft Sealing Systems for Centrifugal and Rotary Pumps
|
5
|
x
|
|
|
| CRE
|
Std
|
685
|
Sealless Centrifugal Pumps for Petroleum, Petrochemical, and Gas Industry Services
|
3
|
|
x
|
|
| CRE
|
RP
|
686
|
Machinery Installation and Installation Design
|
3
|
x
|
|
|
| CRE
|
RP
|
687
|
Rotor Repair
|
2
|
|
x
|
|
| CRE
|
RP
|
688
|
Pulsation and Vibration Control in Positive Displacement Machinery Systems for Petroleum, Petrochemical, and Natural Gas Industry Services
|
2
|
x
|
|
|
| CRE
|
Std
|
697
|
Pump Repair
|
1
|
|
x
|
|
| CRE
|
RP
|
755
|
Fatigue Prevention Guidelines for the Refining and Petrochemical Industries
|
2
|
|
x
|
|
| CRE
|
Std
|
810
|
Welded Plate-Block Heat Exchangers
|
1
|
x
|
|
|
| CRE
|
RP
|
941
|
Steels for Hydrogen Service at Elevated Temperatures and Pressures in Petroleum Refineries and Petrochemical Plants
|
9
|
x
|
|
|
| CRE |
TR |
941-A1 |
Addendum 1 to the Technical Basis Document for API RP 941 |
1 |
|
|
x |
| CRE
|
RP
|
945
|
Avoiding Environmental Cracking in Amine Units
|
4
|
x
|
|
|
| CRE
|
Std
|
975
|
Refractory Installation Quality Control – Inspection and Testing of Refractory Brick Systems and Materials
|
1
|
|
x
|
|
| CRE |
TR |
978 |
Monolithic Refractories: Manufacture, Properties and Selection |
1 |
|
|
x |
| CRE
|
TR
|
981
|
Comparison of ASTM C832 and DIN EN 993-9
|
1
|
x
|
|
|
| CRE
|
Std
|
2000
|
Venting Atmospheric and Low-pressure Storage Tanks
|
8
|
x
|
|
|
| CRE
|
RP
|
2350
|
Overfill Protection for Storage Tanks in Petroleum Facilities
|
5
|
|
x
|
|
| CRE
|
RP
|
2510
|
Design and Construction of LPG Installations
|
9
|
x
|
|
|
| CRE |
Spec |
12B |
Specification for Bolted Tanks for Storage of Production Liquids |
17 |
|
x |
|
| CRE
|
Std
|
520 Pt 1
|
Sizing, Selection, and Installation of Pressure-Relieving Devices in Refineries--Part 1, Sizing and Selection
|
10
|
|
x
|
|
| CRE
|
Std
|
520 Pt 2
|
Sizing, Selection, and Installation of Pressure-Relieving Devices in Refineries, Part II, & Installation
|
7
|
x
|
|
|
| CRE
|
Std
|
560-A1
|
Addendum 1 to Fired Heaters for General Refinery Services
|
5
|
|
x
|
|
| CRE
|
RP
|
932-B
|
Design, Materials, Fabrication, Operation, and Inspection Guidelines for Corrosion Control in Hydroprocessing Reactor Effluent Air Cooler (REAC) Systems
|
3
|
|
x
|
|
| CRE
|
RP
|
934-C
|
Materials and Fabrication of 1-1/4CR-1/2Mo Steel Heavy Wall Pressure Vessels for High Pressure Hydrogen Service Operating at or Below 825 Deg. F (441 Deg. C)
|
2
|
|
|
x
|
| CRE
|
RP
|
934-F
|
Minimum Pressurization Temperatures, MPT, for Heavy Wall Pressure Vessels
|
1
|
|
x
|
|
| CRE
|
TR
|
934-H
|
Maintenance and Inspection of 2-1/4Cr-1Mo and 2-1/4Cr-1Mo-V Steel Pressure Vessels in High Pressure, High Temperature Hydrogen-Containing Service
|
1
|
x
|
|
|
| CRE
|
TR
|
934-J
|
Coke Drum Repair
|
1
|
x
|
|
|
| GCM |
RP |
1595 |
Design, Construction, Operation, Maintenance & Inspection of Aviation Pre-Airfield Storage Terminals |
3 |
x |
|
|
| GCM
|
RP
|
1604
|
Closure of Underground Petroleum Storage Tanks
|
4
|
x
|
|
|
| GCM |
RP |
1637 |
Using the API Color-Symbol System to Mark Equipment and Vehicles for Product Identification at Gasoline Dispensing Facilities and Distribution Terminals. |
4 |
x |
|
|